简体版 English
登入 註冊

風險度英文

發音:  
"風險度"怎麼讀用"風險度"造句

英文翻譯手機手機版

  • age
  • degree of risk
  • risk profile

例句與用法

  • Part six is the calculation of risk
    第六部分為風險度的計算。
  • Enterprise information technology challenges of comprehensive risk management
    關于資產風險度賦值中一些概念問題的探討
  • Early - warning to the management risk in expressway by the methods of weighted averages about risk degree
    風險度加權平均法預警高速公路經營風險
  • Keywords : preventive maintenance , risk , probabilistic failure analysis , probabilistic risk assessment , importance measure
    關鍵詞:預防維護、風險度、機率失效分析、機率風險評估、重要度量測。
  • Taking the results of part foul ; and part five into the formula : risk = hazard x vulnerability . it calculates the risk of every debris flow ditch
    將第四;第五部分的計算結果代人公式: “風險度危險度x易損度” ,計算出各泥石流溝的風險度。
  • The paper applies the entropy theory to the analysis of investment decision and presents the methods of real weight combined the concept of entropy with decision - maker ' s subjective
    以熵權的理論有效解決權重法中存在的主觀性,并以熵計算投資風險度,得出帶風險度的凈現值公式。
  • In the early of 1980s , commercial bank gradually set up an evaluation system and designed some assessment indexes based on loan risk degree pursuant to general rules on loan
    從80年代初,商業銀行逐步探索并形成了一套評價方法,并遵循《貸款通則》實施的要求建立了以貸款風險度為基礎的評價指標。
  • The by applying fuzzy comprehensive living examples , an objective risk degree is worked out , which can be offered to real estate developers as a scientific reference on investment and decision
    然后,應用模糊綜合評價模型,結合實例,計算得出某一項目的風險度,為開發商投資決策提供了科學的依據。
  • According to the quantitative analysis of many risk factors in a region of chemicals terminal , exponents of regional environment risk degree are concluded , which can provide the risk controlling and management with scientific guidelines
    在定量評價區域內多個風險因素的基礎上,得到區域環境風險的綜合指數或風險度,為控制和管理風險提供科學依據。
  • Frequent reviews - team progress is reviewed as frequently as environmental complexity and risk dictates ( usually 1 to 4 week cycles ) . a functional executable must be prepared by each team for each review
    經常總結隨著環境復雜度和風險度的改變,小組的進度經常要進行總結(通常為1到4個星期為一個周期) 。為每次總結每個小組都必須精心準備有一定功能的可執行代碼。
  • 更多例句:  1  2  3  4
用"風險度"造句  
風險度的英文翻譯,風險度英文怎麽說,怎麽用英語翻譯風險度,風險度的英文單字,风险度的英文风险度 meaning in English風險度怎麼讀,英文發音,英文拼音,例句,用法和解釋由查查在綫詞典提供,版權所有違者必究。